One of the things that makes Han River Bridge the “star” of Da Nang tourism is the moment the bridge swings in the middle of the night, as reflecting lights on the water create a rare magical scene. According to the Da Nang Department of Transport (2026), the bridge swing schedule is flexibly adjusted to ensure traffic flow while catering to tourists' sightseeing needs.
- From Monday to Friday (weekdays): Traffic pauses at 0:45 AM. The bridge starts swinging at exactly 1:00 AM. The swing process takes about 15-20 minutes. After all vessels have passed, the bridge returns to its original position around 2:00 AM – 4:00 AM (depending on vessel density).
- Saturday and Sunday (weekends): To serve tourism, the bridge stops vehicle traffic at 10:45 PM and swings at 11:00 PM. Around 12:00 AM (midnight), the bridge returns to normal. This is the ideal time slot for tourists as it is not too late at night.
Note: The swing schedule may change slightly during major holidays (such as Lunar New Year) for extra service. You should check the latest information on the Da Nang tourism fanpage or map applications before visiting.


